Réponse rapide: A useful factory acceptance test (FAT) uses agreed material and drawings, written pass criteria, recorded measurements, safety checks and a signed list of open items. Define the test before production is complete so both buyer and manufacturer know what evidence is required.
Agree the test samples in advance
Select representative material and part drawings that reflect normal work. Include at least one demanding size or shape where practical. Record material grade, diameter or strip size, drawing revision and the quantity to be tested. Confirm whether the buyer supplies material or the factory prepares an agreed equivalent.
Write measurable acceptance points
State what will be checked: dimensions, longueur de coupe, forme de courbure, repeatability, basic cycle sequence, control functions and included accessories. Identify measuring tools and who records results. Acceptance points should match the machine specification and the buyer’s application rather than rely on broad terms such as “high accuracy.”
Observer la séquence de fonctionnement complète
Review loading, installation, sélection de programme, operation, finished-part collection and normal stop procedures. Check that guards and emergency stop controls are present and that operator documentation is available. Any site-specific electrical and safety rules should also be reviewed before shipment and installation.
Close the record clearly
Keep photos or video of the test, measurement sheets, machine identification, software or program notes and the final open-item list. Record who approved the test and whether any corrective work is required before packing.
Coordinate your test with Haihui
Send your target model, dessins, material specification and acceptance criteria before the factory test date. Haihui can discuss a test plan for the selected rebar processing machine. Contacter Haihui with your project details.
Téléphone / WhatsApp: +86 13932960232
