إجابة سريعة: Before first production on a steel bar bending machine, confirm the approved drawings, حجم المواد والصف, selected tooling, power and floor conditions, operator training and safety procedure. Run a controlled sample and record the approved setup before releasing a batch.
Verify the job and material
Use the current drawing revision and check that the material matches the order. Confirm bar diameter, درجة, طول القطع, bend sequence and finished dimensions. If a drawing is unclear, resolve it before programming or tooling so operators do not have to guess at the workbench.
Check the machine area
Clear the feed and outfeed paths, confirm stable floor conditions and provide enough space for long bars to move safely. Make sure power and grounding arrangements match the supplier’s documentation. Keep emergency stops accessible and review the site’s lockout procedure.
Use a controlled first-off inspection
Produce a small sample batch at the agreed settings. Inspect critical dimensions and bends against the drawing, document any permitted adjustment and have the responsible person approve the setup. Keep the sample with its job record so later operators can compare results.
Train operators on the actual controls
Review start and stop procedures, اختيار البرنامج, تحميل المواد, حراسة, alarm response and routine cleaning. Training should use the delivered machine configuration and its manual. Do not bypass guards or safety controls to maintain output.
Plan your commissioning discussion
Haihui can review the selected machine, material and setup questions before dispatch or during commissioning planning. Send your application details to the factory team.